HUNITY being assembled, February 2025
HUNITY's boards on the backplane
During assembly
The board stack and the side panels
HUNITY in the assembly frame
HUNITY, February 2025
HUNITY on the shaker, 21 March 2025
The vibration test fixture
Vibration test on the shaker
HUNITY in its test container
Before the thermal vacuum test
HUNITY in the thermal vacuum chamber
HUNITY on the chamber's copper plate
Wired up for the thermal vacuum test
The open thermal vacuum chamber from above
In the thermal vacuum chamber
The sealed chamber
HUNITY through the chamber window during the test
Inside HUNITY, with its name tag, March 2025
Signing with Alba Orbital before the fit check, Glasgow, March 2025
Fit check at Alba Orbital
Fit check: HUNITY going into the Alba Orbital deployer
HUNITY inside the deployer
Inside the deployer
HUNITY on the deployer rail
Fit check at Alba Orbital
HUNITY during assembly, May 2025
HUNITY
HUNITY during assembly, July 2025
HUNITY in its transport case, July 2025
HUNITY's boards from above
HUNITY from the side
HUNITY's solar panel side
HUNITY on the scales: 868 g, July 2025